United States of America
OCCUPATIONAL SAFETY AND HEALTH
REVIEW COMMISSION
1120 20th
Street, N.W., Ninth Floor
Washington, DC 20036-3457
SECRETARY OF LABOR, |
|
Complainant, |
|
v. |
|
CONRAD YELVINGTON DISTRIBUTORS, INC., |
|
Respondent. |
|
ON BRIEFS:
Ronald Gottlieb, Appellate Attorney; Heather Phillips,
Counsel for Appellate Litigation; Ann Rosenthal, Associate Solicitor of Labor
for Occupational Safety and Health; M. Patricia Smith, Solicitor of Labor; U.S.
Department of Labor, Washington, DC
For
the Complainant
David
M. Toolan, Deputy General Counsel, Oldcastle Law Group, Atlanta, GA
For
the Respondent
Veronica Chittim,
Trial Attorney; Rebecca Behravesh, Trial Attorney; John Seguin, Assistant Chief
Counsel for Safety; Sarah Inderbitzin, Deputy Chief Counsel; Amit Bose, Chief
Counsel; Federal Railroad Administration, Washington, DC
Amicus
Curiae
Christopher S.
Perry, Senior Trial Attorney; Peter Plocki, Deputy Assistant General Counsel
for Litigation; Paul M. Geier, Assistant General Counsel for Litigation;
Kathryn B. Thompson, General Counsel; United States Department of
Transportation, Washington, DC
Amicus
Curiae
DECISION
Before: ATTWOOD, Chairman and
MacDOUGALL, Commissioner.
BY THE COMMISSION:
At issue
before the Commission is a decision of Administrative Law Judge Sharon D. Calhoun
affirming a citation issued to Conrad Yelvington Distributors, Inc., a company
that distributes aggregate such as ballast stone, concrete, decorative stone,
and asphalt, by rail. On October 24, 2013, Conrad was providing aggregate by
rail for the construction of a SunRail commuter rail station in Sanford,
Florida, when a train it was operating derailed and overturned, resulting in
fatal injuries to the Conrad employee serving as the train’s conductor.
Following an inspection, the Occupational Safety and Health Administration
issued Conrad a citation alleging a serious violation of section 5(a)(1) of the
Occupational Safety and Health Act, 29 U.S.C. § 654(a)(1).
The only
issue in dispute on review is whether the judge erred in rejecting Conrad’s
assertion that OSHA’s jurisdiction over the cited working conditions was
preempted by the Federal Railroad Administration (FRA). According to the judge,
the yard track on which Conrad operated the train at the worksite was a “plant
railroad” that the FRA had chosen not to regulate. As discussed below, the
judge’s decision is affirmed.
DISCUSSION
Under
section 4(b)(1) of the OSH Act, OSHA’s jurisdiction over working conditions of
employees may be preempted by another federal agency if that agency
“exercise[s] statutory authority to prescribe or enforce standards or
regulations affecting occupational safety or health.” 29 U.S.C. § 653(b)(1).
In determining whether there is preemption under § 4(b)(1), the Commission
considers: “(1) whether the other federal agency has the statutory authority to
regulate the cited working conditions, and (2) if the agency has that
authority, whether the agency has exercised it over the cited conditions by
issuing regulations having the force and effect of law.” JTM Indus.,
Inc., 19 BNA OSHC 1697, 1699 (No. 98-0030, 2001) (citations omitted).
In its
briefing notice, the Commission asked the parties, as well as the FRA, to
address whether OSHA has jurisdiction over the cited working conditions. On
review, Conrad principally reiterates the argument it made before the
judge—that the FRA’s jurisdiction preempts OSHA’s jurisdiction because the FRA
has regulated its operations on the yard track. Conrad also states, however,
that “[i]f the FRA stipulates that [Conrad’s] operations are a Yard Track and
not subject to the FRA’s regulation, . . . [Conrad] will
agree to adopt the FRA’s position with regard to those facts.”
The FRA, in
the amicus curiae brief it filed with the Commission, states that it has
broad jurisdiction over all railroad carriers. However, as a policy matter, it
has chosen to exclude “plant railroads” from regulation. See 49 C.F.R.
pt. 209, app. A. As explained in its brief, the FRA considers an entity to be a
plant railroad when the track on which it operates: (1) is leased from a
general system railroad for the entity’s exclusive use; (2) is only used by the
entity and general system railroad for purposes of moving rail cars shipped to
or from the plant; and (3) is immediately adjacent to the plant. Here, the FRA notes that: (1) Conrad has a lease agreement with
the general system railroad for exclusive operation over the yard track; (2)
Conrad only operates over the yard track for the purpose of moving rail cars to
or from its plant for pick up or set out by a general system railroad; and (3)
that track is immediately adjacent to its plant. Thus, according to the
FRA, Conrad operates on the yard track as a “plant railroad” and, therefore,
the company is “excepted from FRA’s safety jurisdiction.” Id. Conrad has
not filed a reply brief in response to the FRA’s amicus brief. See Commission
Rule 93, 29 C.F.R. § 2200.93 (“Any reply brief permitted by these rules or by
order shall be filed within 15 days after the second brief is served.”).
Given
Conrad’s acceptance of the position set forth by the FRA, we find that OSHA’s
jurisdiction over the cited conditions is no longer in dispute. Accordingly,
the judge’s decision is affirmed.
SO
ORDERED.
/s/
Cynthia L. Attwood
Chairman
/s/
Heather L. MacDougall
Dated: March 30,
2016 Commissioner
OCCUPATIONAL
SAFETY AND HEALTH REVIEW COMMISSION
1924
Building - Room 2R90, 100 Alabama Street, SW
Atlanta,
Georgia 30303-3104
Secretary of Labor, |
|
Complainant, |
|
v. |
OSHRC
Docket No. 14-0713 |
Conrad Yelvington Distributors, Inc., |
|
Respondent. |
|
Appearances:
Rolesia Butler Dancy, U.S. Department of
Labor, Atlanta, Georgia,
For the Complainant
David
M. Toolan, Esquire, Oldcastle Law Group, Atlanta, Georgia,
For the Respondent
Before: Administrative Law Judge Sharon D. Calhoun
DECISION AND ORDER
Conrad
Yelvington Distributors, Inc. (CYDI) distributes aggregate such as ballast
stone, concrete, decorative stone and asphalt by rail for construction
projects. On October 24, 2013, the Occupational Safety and Health
Administration (OSHA) inspected the jobsite located at the SunRail Station in
Sanford, Florida, where CYDI was engaged to transport aggregate for
construction activities occurring on the site. The inspection was initiated
following notification of a fatality which occurred on the jobsite on October
24, 2013. On that day, an employee of CYDI was fatally injured when the train he
was working from derailed, then overturned, crushing him. Safety and Health
Compliance (CSHO) Luis Cebollero conducted the inspection of the jobsite for
OSHA. As a result of the inspection, the Secretary issued a serious citation to
CYDI on April 21, 2014.
The
serious citation alleges CYDI violated the general duty clause set out at
section 5(a)(1) of the Occupational Safety and Health Act of 1970, 29 U.S.C. §
651 et seq. (Act) by exposing employees to a struck/crushed-by hazard
from rail cars and/or material being transported should a train be derailed.
The Secretary proposed as a feasible means of abatement, communication between
all parties to ensure that everyone is informed of when a train will be
traveling through the SunRail Station construction site. A penalty in the
amount of $6,300.00 was proposed by the Secretary for this alleged violation.
CYDI timely contested the citation. Thereafter, the Court
held a hearing in this matter on January 29, 2015, in Orlando, Florida.
Post-hearing briefs were filed by the parties on April 14, 2015.
For the reasons discussed below, the Citation is affirmed
as serious and a penalty of $6,300.00 is assessed.
Jurisdiction
CYDI denies jurisdiction of this matter is conferred upon
the Commission, contending the Federal Railroad Administration (FRA) has
exclusive jurisdiction of this matter. It also alleges as an affirmative
defense that OSHA’s authority is preempted by the FRA (Answer, ¶ 1, p. 1).
Preemption under § 4(b)(1) of the Act by its nature is properly asserted as an
affirmative defense, and as such is not jurisdictional, instead it is
exemptory. Pennsuco Cement and Aggregates, Inc., 8 BNA OSHC 1378, 13179,
n. 2 (No. 15462, 1980); Chevron Oil Co., 5 BNA OSHC 1118, 1119, n. 3
(Nos. 10799, 10646, 10786, 1977). Therefore, CYDI’s affirmative defense of
preemption will be addressed below in the Discussion section of this
Decision.
Despite denying jurisdiction on the basis of preemption,
CYDI admitted in its Answer and at the hearing that it was an employer engaged
in a business affecting interstate commerce within the meaning of section 3(5)
of the Act, 29 U.S.C. § 652(5) (Tr. 10-11; Answer ¶ 2, p. 1). Further, CSHO
Cebollos testified CYDI engaged in activities that affected interstate commerce
(Tr. 114). The Act applies to a “person engaged in a business affecting
commerce who has employees.” 29 U.S.C. § 652(5), see Don Davis, 19 BNA
OSHC 1477, 1479 (No. 96-1378, 2001). Therefore, jurisdiction of this action is
conferred upon the Occupational Safety and Health Review Commission pursuant to
§ 10(c) of the Act.
Background
The
SunRail Station in Sanford, Florida, a commuter rail station for transporting
people to other commuter stations, was under construction at the time of OSHA’s
inspection at issue in this matter (Tr. 90-91). Construction had been ongoing
for approximately seven to eight months and the construction was at least 60%
complete at the time of the inspection (Tr. 30). A Joint venture between Archer
Western and Railworks Maintenance of Way, Inc. (Railworks) was created and this
joint venture was the prime contractor for the SunRail Station project (Tr.
155-156). Railworks was under contract to build the tracks for the SunRail
Station and to provide protection for the employees who worked on the tracks
(Tr. 29). Archer Western provided employees for the construction work occurring
on the project. CYDI was engaged to transport aggregate consisting of ballast
stone and rocks by rail for the construction at the SunRail Station.
The
aggregate transported by CYDI was to be used to build the tracks on the
project. When needed, aggregate was transported by CYDI to an area on the site
north of the SunRail Station identified as the yard. CYDI’s operations for this
project originated from its terminal located south of the SunRail Station
construction site and ended at the yard, approximately 1½ miles from the CYDI
terminal (Tr. 89-90). The area of the SunRail Station under construction was
located between the yard and the CYDI terminal.
Three
sets of tracks ran through the SunRail Station. These tracks were identified as
Track 1, Track 2, and the Yard Track (Tr. 37). The Yard Track was used only by
CYDI to transport the aggregate and was separate from the other tracks on the
site (Tr. 37).
Tracks 1 and 2 were used by CSX and
Amtrak (Tr. 37). Tracks 1 and 2 were described as controlled tracks, meaning
they had a dispatcher, train orders and train bulletins to inform of anything
which could affect the speed or movement of the train. The train bulletins and
orders were provided to all crews working each day on the controlled tracks
(Tr. 44). A radio frequency was also used to provide information regarding
train activity. The Yard Track was described as non-controlled, meaning it had
no dispatcher or other controls for the track (Tr. 82). Therefore, CYDI had no
dispatcher, was not on the radio frequency and received no train orders or
train bulletins for its operations on the site. CYDI operates only on
non-controlled tracks.
The SunRail project also utilized briefings to inform
personnel of activities occurring on the project. These briefings were
conducted daily by the Employee in Charge (EIC) and by the Point of Contact
(POC)(Tr. 43-45). CYDI was not included in these briefings (Tr. 58).
The non-controlled track used by CYDI to transport the
aggregate for use on the construction site traversed the area where
construction employees were working. Therefore, derails were put in place to
protect these employees. Derails were placed on the north and south ends of the
station to keep the CYDI train on the non-controlled track from coming through
the area where the employees were working (Tr. 105). Because CYDI was not in
the communication loop, the POC would typically communicate face to face with
the conductor of the CYDI train once the train stopped short of the
construction site (Tr. 38). The train would not proceed through while the
employees were working and a derail was in place.
On
October 24, 2013, CYDI planned to transport 10 train cars loaded with ballast
stone to the yard, place the cars on an empty track and return (Tr. 169-170,
171). Arrangements for the delivery of the ballast stone for that day had been
communicated by email to Eric Lawrence, Area Manager for CYDI by Clint Hoffman of
Railworks the day before (Tr. 171-172; Exh. R-1). Hoffman was project manager
for the SunRail project (Tr. 183). Lawrence testified CYDI knew the
construction crew started early in the morning at 6:30 or 7:00, but this was
very unpredictable (Tr. 174). CYDI crews began working at 5:00 a.m. (Tr. 180).
According to Lawrence, in order to transport the aggregate through the
construction site, CYDI had to transport the aggregate through the construction
site before the derails were put in place to protect the workers (Tr. 180).
Lawrence assigned the engineer and conductor to transport
the aggregate to the yard (Tr. 173). He was their supervisor (Tr. 162). On the
morning of October 24, 2013, the CYDI crew utilized a “push move” to transport the aggregate. In a push
move, the locomotive or engine is located behind the train cars and pushes the
cars forward. It was dark out when the CDYI crew began the push move that
morning. The engineer was located in the engine and the conductor was located
on the outside of the tenth rail car, putting him in front, in the direction of
travel. The conductor was so situated to provide information to the engineer
regarding obstacles and other conditions affecting the travel along the track
(Tr. 98-99). The engineer and conductor communicated with each other by a
two-way radio (walkie-talkies) (Tr. 97, 99). The train was traveling at the
authorized speed for a non-controlled track, which was limited to 5 mph (Tr.
40, 179). They were heading north in the direction of the yard (Tr. 100).
Shortly after 6:30 a.m. the tenth rail car contacted a derail which had been
placed at the south end of the track (Tr. 66). The train cars derailed (Tr.
52-54). At least three of them overturned, including the tenth car upon which
the conductor was riding, spilling the ballast stone (Tr. 53-54). The conductor
was trapped underneath the overturned rail car and ballast stone (Tr. 54). He
died as a result of being crushed (Tr. 107).
The derails on the track had been placed there by Travis
Kendrick, POC for the SunRail project (Tr. 28-29). Kendrick was employed at
that time by Railworks and was responsible for providing protection for the
Archer Western employees who were scheduled to pour concrete that morning (Tr.
28, 29, 36-37). His duties involved receiving and conducting briefings; and
placing the derails on the Yard Track (Tr. 43-45). On October 24, 2013,
Kendrick placed the derail on the south end of the Yard Track at 6:30 a.m., and
placed a derail on the north end of the Yard Track approximately 5 minutes
later (Tr. 44, 46). According to Kendrick each derail was placed approximately
60 feet from the station (Tr. 45-46, 67). Kendrick testified the lighting
conditions were bad that morning. It was dark; however there was other lighting
at the very south end of the track (Tr. 49). Once the derails were in place,
Kendrick went to his truck to fill out his job briefings (Tr. 75). Shortly
after he began working on the job briefings in his truck, he heard a loud crash
and then employees knocking on his truck telling him a train “went to the
ground.”(Tr. 52). According to Kendrick, they did not say derail, just that it
was a bad situation (Tr. 52). Kendrick went to the area of the derailment and
learned the conductor was underneath the overturned train cars and ballast
stone (Tr. 53). Kendrick called 911, the EIC and his supervisor. He then
assisted with trying to free the conductor (Tr. 53).
OSHA initiated its inspection regarding the accident on the
same day it occurred. Based on CSHO Cebollero’s inspection findings, the
Citation for violation of the general duty clause at issue in this matter was
issued to CYDI. Approximately one month after the accident, a re-enactment of
the accident was conducted. CSHO Cebollero testified the re-enactment
demonstrated the conductor would not have been able to see if there was an
obstruction in front of him while he was riding the train. According to CSHO
Cebollero, because the train moved very slowly, you could not hear it
approaching. Only when the train was within the distance of approximately 100
feet, could it be heard. Because the train had no lights, you could not see it
approaching (Tr. 111, 115).
DISCUSSION
Preemption
CYDI
contends the Federal Railroad Administration (FRA) has exclusive jurisdiction
of this matter, arguing the FRA has the statutory authority to regulate the
working conditions cited in this matter and has exercised that authority by
issuing regulations having the force and effect of law (CYDI’s brief, p. 6).
CYDI relies on Rockwell International Corp., 17 BNA OSHC 1801, 1803
(Nos. 93-45, 93-228, 93-233, 93-234, 1996). Further in support, CYDI cites only
to the testimony of two witnesses: CSHO Cebollero’s cross examination testimony
that no specific aspects of railroad safety are regulated by OSHA (Tr. 132);
and Kendrick’s answer in the affirmative when asked if it was his
“understanding that the FRA provided all the regulations governing your conduct
while operating a train and serving as a conductor?” (Tr. 63) (CYDI’s brief, p.
7).
The
Court is not persuaded by CYDI’s arguments and finds the authority and evidence
it cites in support insufficient to establish the asserted preemption by the
FRA. The Court notes although Rockwell sets forth the requirements an
employer must establish for preemption of OSHA’s jurisdiction in Rockwell,
NASA had not taken action to preempt OSHA’s jurisdiction although it had the
legal authority to do so (Id. at 1803). Similarly, as set forth below, the FRA
has declined to exercise its statutory authority over the type of working
conditions present in the instant matter. The testimony cited to by CYDI also
does not further its position, reflecting only the opinions and understandings
of two lay witnesses. The Court finds this testimony is outweighed by the FRA’s
policy determinations regarding activities, such as those found in this matter,
it has chosen not to regulate.
Section
4(b)(1) of the Act, 29 U.S.C. § 653(a)(1) provides:
Nothing in this Act shall
apply to working conditions of employees with respect to which other Federal
agencies, and State agencies acting under section 274 of the Atomic Energy Act
of 1954, as amended (42 U.S.C. 2021), exercise statutory authority to prescribe
or enforce standards or regulations affecting occupational safety or health.
Section
4(b)(1) of the Act does not provide an industry-wide exemption for railroads.
The FRA does not divest OSHA of all jurisdiction over railroad safety and
health, but only as to the aspects of railroad safety the FRA has chosen to regulate.
Association of American Railroads v. Department of Transportation, 38
F.3d 582 (D.C. Cir. 1994). The FRA exercises authority over any railroad
operating on the “general railroad system of transport,” which is defined as
“the network of standard gage track over which goods may be transported
throughout the nation.” 49 C.F.R. Part 209, Appendix A. Although the FRA’s
statutory authority extends to all railroad carriers, the FRA has chosen, as a
matter of policy, not to exercise its jurisdiction under all of its regulations
to the full extent permitted by statute, choosing to regulate something less
than the total universe of railroads.
For example, all of FRA’s
regulations exclude from their reach railroads whose entire operations are
confined to an industrial installation (i. e. “plant railroads”), such as those
in steel mills that do not go beyond the plant’s boundaries . . . Other
regulations exclude not only plant railroads, but all other railroads that are
not operated as a part of, or over the lines of, the general railroad system of
transportation. E.g., 49 CFR 214.3 (railroad workplace safety).
49
C.F.R. Part 209, Appendix A.
The
Secretary contends CYDI’s rail operations at its Sanford terminal meet the FRA
definition of a “plant railroad” for which the FRA does not exercise its
regulatory authority. (Secretary’s brief, p. 16). The Court agrees. CYDI
operated only on the Yard Track, transporting aggregate a distance of
approximately 1½ miles from its terminal to the yard (Tr. 99). The record
evidence shows its activities were confined to delivering train cars of
aggregate and returning to its Sanford terminal. No evidence was adduced at the
hearing showing CYDI’s operations along the Yard Track extended beyond the area
of the SunRail project, or that the Yard Track extended beyond the construction
site. Nor does the evidence support a finding the Yard Track was capable of the
transport of goods throughout the nation, or the travel of passengers between
cities and within metropolitan and suburban areas, as required by the FRA
definition of “general railroad system of transportation.” 49 C.F.R. Part 209,
Appendix A. The FRA exercises its statutory authority only over any railroad
operating on what it has defined as the general railroad system of
transportation. Accordingly, since the Yard Track does not meet this FRA
definition, the undersigned finds CYDI’s operations are not regulated by the
FRA. Although the FRA has the statutory authority to regulate the operations
performed by CYDI, for policy reasons, it has chosen not to do so. CYDI’s
affirmative defense of preemption, therefore fails.
The Citation
The Citation at issue here alleges a serious violation of
the general duty clause, section 5(a)(1) of the Act. Section 5(a)(1) requires
each employer to “furnish to each of his employees employment and a place of
employment which are free from recognized hazards that are causing or are
likely to cause death or serious physical harm to his employees.” 29 U.S.C. § 654(a)(1).
It alleges that employees were exposed to a struck/crushed-by hazard from rail
cars and/or the material being transported should a train be derailed in
violation of section 5(a)(1) as follows:
a) On
or about 10/24/2013 an employee riding on the steps of the tenth rail car of a
train traveling in reverse on an uncontrolled track was trapped under the tenth
rail car when it and three other rail cars derailed after contacting a derailer
that had been placed on the track near the Sun Rail station that was under
construction.
As a feasible means of abatement, OSHA
proposed:
[T]o require communication
between all parties to ensure that everyone is informed of when a train will be
traveling through the Sun Rail station construction site so that employees can
be cleared from the area of the tracks, derailers are not placed on the tracks
and any derailers that had been placed on the tracks to protect the
construction workers are removed from the track so the train can safely pass
through.
Elements of a
§ 5(a)(1) Violation
Section 5(a)(1) of the Act
mandates that each employer “furnish to each of his employees employment and a
place of employment which are free from recognized hazards that are causing or
are likely to cause death or serious physical harm to his employees.” 29 U.S.C.
§ 654(a)(1). To establish a violation of the general duty clause, the Secretary
must show that: (1) a condition or activity in the workplace presented a
hazard; (2) the employer or its industry recognized the hazard; (3) the hazard
was likely to cause death or serious physical harm; and (4) a feasible means
existed to eliminate or materially reduce the hazard. Pegasus Tower, 21
BNA OSHC 1190, 1191, 2005 CCH OSHD ¶ 32,861, p. 53,077 (No. 01-0547, 2005).
Erickson
Air-Crane, Inc., 2012 WL 762001 at *2 (No.
07-0645, 2012). In addition, the evidence must show the employer knew or with
the exercise of reasonable diligence could have known of the hazardous
condition. Deep South Cane & Rigging Co., 23 BNA OSHC 2099 (No.
09-0240, 2012), aff’d Deep South Crane & Rigging Co. v. Seth D. Harris,
24 BNA OSHD 1089 (5th Cir. 2013); Otis Elevator Co., 21 BNA
OSHC 2204 (No. 03-1344, 2007).
Whether an Activity or Condition at the site Constituted a
Hazard
The
Commission has held that, as part of his burden for proving a § 5(a)(1)
violation, the Secretary “must define the cited hazard in a manner that gives
the employer fair notice of its obligations under the Act by specifying the
conditions or practices over which the employer can reasonably be expected to
exercise control.” Otis Elevator Co., id at 2206. The Secretary
defines the hazard here as a struck/crushed-by hazard from rail cars and/or the
material being transported should a train be derailed. The conductor is exposed
to the hazard when transporting aggregate because he rides on the outside of
the train car, positioned on a ladder attached to it, maintaining three points
of contact with the ladder (Tr. 41-42, 169).
The
push move utilized by the CYDI crew at the time of the accident occurred before
sunrise and was made with the engine located in the back, and with ten cars
ahead of it. Therefore, the engine lights were not available to illuminate the
direction of travel for the conductor. The ten train cars carried ballast
stone, which weighed in excess of 2,000 tons (approximately 200 tons per train
car including the weight of the train car) (Tr. 171; Exh. R-1). The ballast
stone was transported uncovered in the train cars (Exh. C-1, pp.1 and 5). Prior
to the push move by CYDI, derails had been placed on the track to protect the
construction employees. A derail would cause the train to derail so it is
prevented from traveling into the area where the employees are located (Tr.
64). The train contacted the derail on the south end of the site and overturned
as a result, causing the conductor to be struck and crushed by the load and/or
train car (Tr. 52-54).
Because
the purpose of the derail is to cause an abrupt stop of the train travel and
derail the train, as occurred in the accident here, employees riding on the
train at a minimum are subject to the hazard of being struck by materials being
carried uncovered in the train cars, should they become dislodged as a result
of the derailment. Here not only was the train derailed, but the cars
overturned spilling several tons of ballast stone. The overturning of rail cars
is not the intended purpose of derailment.
CYDI
identifies the hazard as that of an improperly placed derail and acknowledges
an improperly placed derail poses a workplace hazard which could cause serious
injury or death (CYDI, brief, p. 5). Regardless of whether the derail was
improperly placed, the hazard of employees being struck and crushed would be
the same due to the abrupt derailment action should a train come into contact
with a derail.
The
Court finds the Secretary has established a condition or activity on the
jobsite which constituted a hazard.
Whether CYDI or its Industry Recognized the Activity or
Condition was Hazardous
A
recognized hazard is a practice, procedure or condition under the employer’s
control that is known to be hazardous by the cited employer or the employer’s
industry. Pelron Corp., 12 BNA OSHC 1833, 1835 (No. 82-388, 1986). The
Secretary contends CYDI recognized the hazards associated with a train striking
a derail.
The
record shows derailment of a train is a condition or practice that can result
in hazardous consequences and should be avoided. As evidenced by provisions in
its Railroad Operating Rules Manual, CYDI set forth requirements for its
employees to avoid conditions which could result in a derailment (Exh. C-2).
Therein, CYDI provides that trains shall be moved at a speed that will permit
stopping within one-half the range of vision, stopping short of, among other
items, a derail (Tr. 111; Exh. C-2, p. 68). Further, the responsibility of the
conductor was to look for obstructions, such as derails on the track, so the
train could avoid them (Tr. 98-99).
The
record evidence reveals CYDI was aware that derails were placed to protect the
construction workers on the SunRail jobsite. CYDI Rail Manager Lawrence’s
testimony reveals CYDI wanted to deliver the aggregate on the morning of
October 24, 2013, before the construction workers began working in order to
avoid the derails (Tr. 180). According to Lawrence, “once the Sunrail derails
are out they won’t take them out and we can’t go thru.” (Tr. 180). POC Kendrick
testified, however, that if they contacted him, he would move the derails so
they could proceed through (Tr. 55-56).
Further,
as reflected in the photographs admitted into evidence, the train cars carrying
the ballast stone were not covered (Exh. C-1, pp. 1, 5). The uncovered
aggregate in the train cars was in plain view. The Court finds these conditions
establish CYDI’s recognition of the hazard of employees being struck or crushed
by a train or its contents should the train derail. The second element of the
Secretary’s case is established.
Whether the Hazard Caused or was Likely to Cause Death or
Serious Physical Harm
There is no question, and the facts of this case
demonstrate, the hazard cited in this case caused death. The conductor died
from injuries he sustained directly as a result of the train coming into
contact with the derail, causing the train to derail resulting in at least
three cars overturning and spilling their loads. The conductor was trapped
beneath the overturned rail car and ballast stone. The Secretary has
established the third element of his burden of proof.
Whether Feasible Means Existed to Eliminate or Materially
Reduce the Hazard
The Secretary proposes CYDI can eliminate or materially
reduce the hazard by requiring communication between all parties regarding
train activity. To establish the proposed communication is a feasible means of
abatement, the Secretary elicited testimony from CSHO Cebollero. He testified
the communication regarding the train activity OSHA was proposing could take
place by telephone, by radio, or face to face (Tr. 121, 123, 125-127). In
addition, Kendrick, POC for Railworks testified that on one occasion a CYDI
employee, whom Kendrick subsequently befriended, came out and inquired of him
whether any derails were up because they needed to come out and get cars out of
the yard (Tr. 38). Kendrick communicated face to face with this employee
approximately ten times during the several months of construction (Tr. 39). He
further testified:
Q.
All right. Before the accident, how
did Conrad [CYDI] confirm that the yard track was clear or safe for movement?
A.
I always saw someone in person.
Q.
And how did that personal contact come
about?
A.
If it was either in the daytime, they would,
you know, pull up, and the engine would stop way short of the station. And then
a conductor would get off and I would meet him partial the way and we would
have a briefing.
Q.
What would you discuss in that briefing?
A.
What they were going to do, how long it was
going to take.
(Tr. 38). This testimony reveals face to
face communication was feasible.
In addition, the Secretary asserts CYDI’s implementation of
his proposed abatement method, in a bulletin it issued after the accident,
supports the Secretary’s assertion that the proposed communication is feasible
(Exh. C-3).
According to CYDI, the prime contractor denied its requests
to receive copies of the dispatch bulletins, access to the radio frequency,
copies of the project contact list, and to be included on the project contact
list (CYDI’s brief, p. 5). Therefore, CYDI contends OSHA’s proposed abatement
could not be implemented prior to the accident and therefore was infeasible
(CYDI’s brief, p. 5). The Court disagrees. The abatement proposed by the
Secretary requires CYDI to communicate with all parties regarding its
activities, not that they communicate with CYDI. As set forth above, the
Secretary has established a feasible means of abatement.
Whether CYDI had Knowledge of the Violative Condition
An
essential requirement for meeting the Secretary’s burden of proof is
establishing the employer had knowledge of the hazard. “As part of the
Secretary’s prima facie case, [he] must show that the employer had
actual knowledge of the violation or could have discovered it with the exercise
of reasonable diligence.” Otis Elevator Co., 21 BNA OSHC at 2207.
CYDI
was aware derails were placed on the tracks to protect the construction
employees. Further, it was aware that the time when the construction workers
would begin work was unpredictable. CYDI had encountered derails on other
occasions at the jobsite. CYDI knew the load it was transporting on the day of
the accident was uncovered and also knew its conductor was positioned on the
outside of the rail car.
With
reasonable diligence, CYDI could have known the derails had been installed
immediately prior to the push move it made to transport the ballast, if it had
communicated with the POC and all other parties regarding its activities.
Instead of communicating its activities, CYDI gambled it could make the
delivery of the aggregate before the Archer Western employees began work that
morning. CYDI knew the Archer Western employees could begin work as early as
6:30 a.m., so CYDI began its transport of the aggregate sometime prior to 6:30
a.m. However, it did not begin the transport soon enough. The south end derail
had been installed at 6:30 a.m. and the CYDI train made contact with it
approximately five minutes later. Its gamble did not pay off. Had CYDI
communicated at a minimum with POC Kendrick, it would have known whether the
derails were in place.
Lawrence,
Rail Manager for CYDI testified he informed project manager Hoffman by
telephone the day before the accident that CYDI would be delivering the ballast
the first thing in the morning of October 24, 2013, as reflected in his email
to Jennifer Hoffman in CYDI’s corporate headquarters rail logistics department
(Tr. 188-189; Exh. R-1). The Court finds Lawrence’s testimony regarding his
purported telephone conversation with project manager Hoffman to be
self-serving, uncorroborated and therefore not reliable. The Court finds CYDI
failed to communicate its transport of the aggregate for the morning of October
24, 2013.
For the foregoing reasons, the undersigned concludes the
Secretary has met his burden of proving CYDI exposed its employees to crushing
and struck-by recognized hazards. Further the Secretary has established a
feasible means of abating the alleged hazard. The Secretary has met his burden
of proving the alleged violation in this case. The Citation is affirmed.
Penalty Determination
The
Secretary proposed a penalty of $6,300.00 in this case. The Commission, in
assessing an appropriate penalty, must give due consideration to the gravity of
the violation and to the size, history and good faith of the employer. See
section 17(j) of the Act. CSHO Cebollero testified the gravity of the violation
was determined to be high because it resulted in a fatality (Tr. 119). He
further testified because CYDI employs approximately 50 employees, no reduction
for the size of the company was given, and because the accident resulted in a
fatality no reduction for good faith was given (Tr. 114). CYDI had no history
of OSHA violations; therefore they were allowed a 10% reduction for history,
resulting in the proposed penalty of $6,300.00 (Tr. 119). In consideration of
these statutory penalty factors, the Court finds the proposed penalty of
$6,300.00 is appropriate.
Motions
At
the conclusion of the presentation of the evidence at the hearing, CYDI moved
to dismiss the Citation based on the testimony of CSHO Cebollero, arguing
Cebollero’s testimony establishes the elements of the defense of unpreventable
employee misconduct (Tr. 205-207, 210-211). In further clarification, CYDI
moved to amend its Answer to conform to the evidence presented at the hearing
and moved to amend its Answer to allege the unpreventable employee misconduct
defense (Tr. 210-212). The Secretary opposed the motions (Tr. 208). The Court
denied the motions to amend on the basis they were prejudicial; the Secretary
had not tried the issue by consent; and the evidence adduced by the Secretary
was not to establish employee misconduct, but instead to establish knowledge
and recognition of the hazard (Tr. 212-213). The Court deferred its ruling on
the motion to dismiss, and advised the parties the motion to dismiss would be
ruled on in this Decision. For the reasons set forth herein, the Secretary has
met his burden of establishing a prima facie violation of §5(a)(1) of the Act,
therefore CYDI’s motion to dismiss is DENIED.
FINDINGS OF FACT AND CONCLUSIONS OF LAW
The foregoing decision constitutes the findings of fact and
conclusions of law in accordance with Rule 52(a) of the Federal Rules of Civil
Procedure.
ORDER
Based upon the foregoing decision, it is ORDERED that:
1. Respondent’s Motion to Dismiss is DENIED.
2. Item 1 of Citation 1, alleging a
serious violation of Section 5(a)(1) of the Act, is AFFIRMED, and a penalty of
$6,300.00 is assessed.
SO
ORDERED.
_/s/ Sharon D. Calhoun ___
SHARON
D. CALHOUN
Date: September
28,
2015 Judge
Atlanta,
Georgia