Chevron Oil Company, California Co. Division
“SECRETARY OF LABOR,Complainant,v.CHEVRON OIL COMPANY,Respondent.OSHRC Docket No. 10799_DECISION _Before: ROWLAND, Chairman; CLEARY and COTTINE, Commissioners.BY THE COMMISSION:The Secretary of Labor issued to Chevron Oil Company three citationsalleging that Chevron had violated 29 U.S.C. ? 654(a)(1), section5(a)(1) of the Occupational Safety and Health Act of 1970, 29 U.S.C. ??651-678 (\”the Act\”). [[1\/]] Administrative Law Judge Henry F. Martin,Jr. vacated the citations. The Secretary argues that the judge erred invacating citations 1(a) and 2(a).[[2\/]]We agree._Citation 1(a)_This citation, like citation 2(a), concerns structure A, an oil andnatural gas production platform in the Gulf of Mexico off the coast ofLouisiana. [[3\/]] Structure A was rectangular, measuring about 100 feetby 60 to 80 feet. It contained various pipes that transported oil andgas under pressure. Citation 1(a) alleged that Chevron failed toperiodically inspect and test for internal and external corrosion on afour-inch diameter gas lift supply line pipe.Judge Martin vacated the citation on the ground that the Secretary hadfailed to show that Chevron had periodically inspected pipes forinternal and external corrosion in a manner contrary to procedures andpractices engaged in by oil and gas operators in general. The judge’sanalysis reflected Chevron’s lengthy argument at the beginning of thehearing that the citations should be dismissed because the Secretary didnot claim that Chevron’s inspection practices were different from thatof its industry. The Secretary argues that the judge’s approach waserroneous. We agree.The Commission has repeatedly held that the Secretary need not provethat the cited employer or his industry recognizes the abatementmeasures recommended by the Secretary. See Kansas City Power & LightCo., 82 OSAHRC 13\/A2, 10 BNA OSHC 1417, 1422, 1982 CCH OSHD ? 25,957, p.32,539 (No. 76-5255, 1982), and cases cited therein. Because section5(a)(1) requires that employees be furnished employment \”free\”–i.e., asfree as feasible [[4\/]] –from recognized hazards, an abatement orderunder section 5(a)(1) may require that work practices and safetyprecautions be upgraded to feasible levels, which may be greater thanthose taken by the employer or its industry. [[5\/]] For this reason, weagree with the Secretary that Chevron’s conformity with industrypractice is not a basis for vacating the citation.To establish a violation of section 5(a)(1), the Secretary must showthat an employer failed to render its workplace free from a hazard thatis recognized and likely to cause death or serious physical harm to itsemployees. See Little Beaver Creek Ranches, Inc., 82 OSAHRC 36\/A2, 10BNA OSHC 1806, 1810, 1982 CCH OSHD ? 26,125, p. 32,878 (No. 77-2096,1982). The Secretary must also demonstrate that there were feasiblemeans available to abate or materially reduce the hazard. Id.; NationalRealty & Construction Co. v. OSHRC, 489 F.2d 1257, 1267 (D.C. Cir.1973). See our discussion, infra. We conclude that the Secretaryestablished these elements.We first consider whether the Secretary has shown that there was a\”hazard\” within the meaning of the Act. The pipes of this platform donot present an imminent explosion hazard until they have corroded to theextent that the pipe walls cannot withstand the internal pressure oftheir contents. Yet, it would be erroneous to conclude that until thatpoint is reached there is no \”hazard\” within the meaning of the Act. Inasmuch as the primary purpose of the Act is to prevent injuries, it issufficient to find, as we do here, that a condition will becomehazardous if left unchecked. It is undisputed that marine pipelinecorrosion is a slow, continuous process that reduces the thickness ofthe pipe walls and, if unchecked, will lead to the hazard of explosionand fire from the ignition of gas or oil escaping from the corrodedpipes. [[6\/]] For the purpose of brevity, we will refer to the hazardas pipeline corrosion. [[7\/]]We next consider whether the hazard was recognized. We first note thatChevron does not take issue with the Secretary’s claim that corrosion isan ever-present hazard on offshore pipelines. Moreover, a piping manualpublished by Chevron’s parent company, Standard Oil Company ofCalifornia, and produced by Chevron during discovery, shows thatChevron’s industry, if not Chevron itself, recognized the hazard ofcorrosion. Among other things, the manual lists \”[d]eterioration oflines through normal use–external or internal corrosion, deteriorationof protective coatings, etc.\” as a \”[p]rimary area of inspection.\” Themanual emphasizes the importance of maintaining the piping in a safecondition and also assigns responsibility for periodic inspections tothe area supervisor and the division equipment inspector. Moreover, theforeword to the proposed advisory standard of the National Associationof Corrosion Engineers, which was submitted into evidence by Chevron,states in part that \”[t]he control of corrosion on offshore pipelines isimportant to the oil and gas industry because of the economic need toprotect capital investments in manpower and materials . . . .\” This issufficient to establish that the hazard of corroded pipes was recognized.The next element is whether the likely consequence would be death orserious physical harm if an explosion and fire occurred. An explosionand fire caused by the rupture of a pipe at structure A resulted in thedeath of seven persons. [[8\/]] This evidence shows that death or seriousphysical harm was likely. [[9\/]]We also conclude that, despite’s Chevron’s efforts, the workplace wasnot \”free\” of the hazard. [[10\/]] Chevron argues that it had a programof systematic and periodic inspection of the outside of each pipesection that rendered structure A free of the hazard. Chevron employeesassigned to structure A on a regular basis were instructed to look forand report any signs of external corrosion while performing theirassigned duties. Chevron also had a safety committee for each of thetwo work shifts; each committee visited structure A once a month forapproximately one and one-half hours. The committees’ purpose was tofind and prevent or correct hazards, including external corrosion. Onone occasion, Chevron had conducted a riser-by-riser inspection forexternal corrosion. [[11\/]] In addition, structure A was repaintedevery six to eight years. Repainting of necessity included aninspection of the pipe for external corrosion. When a structure wasrepainted, all external corrosion was removed by sandblasting andapproximately five coats of rust resistant paint were applied to the pipes.As to internal corrosion, Chevron argues that it had an adequate programto monitor and prevent internal corrosion. Chevron had a \”corrosioncoupon\” at the pipeline terminal that was inspected monthly andmonitored the amount of internal corrosion. Chevron also injected acorrosion retardant chemical into the pipes. In addition, Chevronsubmitted evidence that chokes located in the pipe coming from eachwellhead were visually inspected weekly and were a reliable means ofdetecting and measuring internal corrosion.Although these efforts were commendable, Chevron’s visual inspectionswere haphazard and unsystematic and did not free the workplace of thehazard. As the Secretary points out, Chevron did not visually inspectevery pipe section. Of equal importance is the fact that the frequencyof these visual inspections was not determined in accordance with anestimation of the remaining safe life of each section. [[12\/]] A seniorconstruction engineer for Chevron testified that the safe life\”exceed[ed] ten, possibly twenty years.\” Yet, Chevron failed toimplement an inspection program based on safe life calculations. Anarea supervisor for Chevron testified that he had never received anydirectives from the head office about safe life projections. Not onlywas the remaining safe life not taken into account, but Chevron alsofailed to maintain records of inspections, tests and corrective actionswith respect to each pipe section. This was a crucial omission. Chevron did not have an adequate recordkeeping system whereby theinformation received from its various methods of detecting internal andexternal corrosion was centralized and analyzed in light of other testsperformed to detect corrosion. [[13\/]] Without such a recordkeepingsystem, Chevron did not have a means of comparing data so that thecorrosion rate for each section could be accurately measured andmonitored. Chevron’s area supervisor testified that he had not receivedany directives about maintenance of records of inspections, remedialwork needed, or monitoring of corrosion rates. [[14\/]]Chevron’s other measures also did not free the workplace of the hazard. The chemical corrosion inhibitor was used to slow internal corrosion,not to eliminate it entirely. Corrosion coupons showed the overallcorrosion rate on the entire structure, but they could not tell Chevronwhich pipe had more internal corrosion and which less unless the couponwas moved to different pipe sections to isolate the more rapidlycorroding section. As the Secretary argues, inspecting chokes andcorrosion coupons was of little use because Chevron had no system ofrecording the corrosion it did detect. Much the same is true ofChevron’s sandblasting and repainting efforts; inasmuch as Chevron didnot know which pipe sections had been repainted many times and which fewtimes, it could not have known the extent to which any pipe section hadsuffered such severe external corrosion that it should be replaced orcarefully monitored. [[15\/]]We now turn to the crux of this case: Are there additional steps thatChevron could take to satisfy its duty under section 5(a)(1) to renderthe worksite as free as feasible from the hazard? An employer’s dutyunder section 5(a)(1) is not an absolute one. Although the general dutyclause speaks of providing a workplace \”free\” of recognized hazards, anemployer is not required to take steps that are not feasible. NationalRealty and Construction Co., 489 F.2d at 1266-67. At the same time, wehave not required the Secretary to establish that his proposed abatementmethod would entirely free the workplace of the hazard. It is enoughthat the prescribed abatement method would materially reduce the hazardto employees. See Litton Systems, Inc., Ingalls Shipbuilding Div., 81OSAHRC 101\/C12, 10 BNA OSHC 1179, 1182, 1981 CCH OSHD ? 25,817, p.32,270 (No. 76-900, 1981); Carlyle Compressor Co. v. OSHRC, 683 F.2d673, 677 (2d Cir. 1982).The Secretary proposed the following steps to materially reduce thehazard posed by excessive internal and external corrosion of pipes: periodic and systematic visual inspection of the outside of each pipesection, ultrasonic testing and x-rays of the interiors of a sample ofpipe sections, and maintenance of records of all inspections, tests andcorrective actions. We find that these are feasible and useful steps.Chevron does not take issue with the feasibility of a program ofsystematic and periodic inspection of the outside of each pipe section. Indeed, Chevron maintains that it had already instituted such aprogram. Chevron argues that x-ray and ultrasonic tests would beneither feasible nor useful because the cost of testing each pipesection would be prohibitive and because each test covers only a fewinches of pipe. Chevron and Judge Martin also noted that theparticular riser pipe that ruptured would have been inaccessible totesting equipment. Yet, the Secretary has not proposed that x-rays andultrasonic testing be used on each pipe section but only on a limitedbasis, i.e., on those pipe sections known or suspected from inspectionrecords to pose a hazard of rupturing due to excessive corrosion. Although these tests sample only a small area of pipe, and some pipe maybe inaccessible, such as the gas riser that burst in this case, thetests would nevertheless be useful in determining the condition ofaccessible pipe sections. As we have already said, the Secretary neednot show that his proposed abatement measures would entirely eliminatethe hazard.We therefore affirm citation 1(a)’s requirements that Chevron institutea program of systematic and periodic inspection for external corrosion,that it use x-ray and ultrasonic tests in conjunction with its othermethods for detecting internal corrosion, and that it couple theseefforts with a comprehensive recordkeeping program. [[16\/]]_Citation 2(a)_This citation alleged that Chevron \”failed to provide a fire detectionsystem that would have automatically released liferafts or personalflotation devices into the water around the ‘A’ structure.\” [[17\/]] Structure A was not equipped with such an automatic ejection system. Employees trying to evacuate the structure to escape flames might jumpas much as 20 feet from the platform into the water and would then lackliferafts and flotation devices. Judge Martin vacated this citationbecause the Secretary did not show that either Chevron or its industryequipped platforms with these devices, or recognized the necessity forsuch equipment. As we have said in our discussion of citation 1(a),this approach was erroneous.Chevron does not dispute the existence of a hazard that is likely tocause death. The only noteworthy dispute between the parties is whetherthe Secretary established a feasible means of reducing or eliminatingthe hazard. As mentioned above, it is not necessary for the Secretaryto show that the hazard can be entirely eliminated; a material reductionis sufficient. The Secretary established that a fire detection systemwith automatically ejected flotation devices was feasible. Thecompliance officer testified that he had worked for the ExxonCorporation and that Exxon had such fire detection systems withautomatically ejected flotation devices on certain of their offshoreplatforms. This evidence taken alone would show that a feasibleabatement method exists that would provide protection against thehazard. [[18\/]]We have held, however, that an employer may rebut this showing byproducing evidence that the use of the abatement method will causeconsequences so adverse as to render their use infeasible. See RoyalLogging Co., 79 OSAHRC 84\/A2, 7 BNA OSHC 1744, 1751, 1979 CCH OSHD ?23,914, p. 28,997 (No. 15169, 1979). Chevron’s only rebuttal testimonywas that of the senior construction engineer who stated that \”it couldconceivably be a hazard to people jumping into the water or peoplealready in the water could be hit by such an object as it was dispensedfrom the structure.\” This testimony is insufficient to rebut theSecretary’s showing. The presence of flotation devices in the waterwould materially reduce the likelihood of an employee drowning in thewater. The benefit afforded by the use of flotation devices greatlyoutweighs the harm that could be caused in the unlikely event that oneof these devices were to hit an employee. On balance, we areunconvinced by Chevron’s rebuttal evidence. We therefore reverse thejudge and affirm citation 2(a)._Penalty_We agree with the Secretary that the violations were serious. For aviolation to be characterized as serious under section 17(k) of the Act,29 U.S.C. ? 666(j),[[19\/]] there must be a substantial probability thatdeath or serious physical harm could result if an incident occurred; theprobability that an incident will occur is irrelevant. See Wright &Lopez, Inc., 81 OSAHRC 92\/D10, 10 BNA OSHC 1108, 1114, 1981 CCH OSHD ?25,728, p. 32,079 (No. 76-256, 1981). It is clear enough here that inthe event of an accident, death or serious harm would have beensubstantially probable.We now turn to the assessment of a penalty.[[20\/]] There was notestimony as to the size of Chevron’s business, but structure A was oneof many platforms owned and operated by Chevron in the Gulf of Mexico. We also take official notice that Chevron is a large employer, withapproximately 1,930 employees. [[21\/]] The gravity of the violations ismoderate. As to good faith, we note that Chevron had attempted toprovide protection to employees. There is no testimony as to thehistory of previous violations. We assess $500 for each violation.Accordingly, we reverse in part the judge’s decision. Citations 1(a)and 2(a) are affirmed; a total penalty of $1,000 is assessed.SO ORDERED.FOR THE COMMISSIONRay H. Darling, Jr.Executive SecretaryDATED: APR 20 1983————————————————————————The Administrative Law Judge decision in this matter is unavailable inthis format. To obtain a copy of this document, please request one fromour Public Information Office by e-mail ( [email protected] ), telephone (202-606-5398), fax(202-606-5050), or TTY (202-606-5386).FOOTNOTES:[[1\/]] Section 5(a)(1), 29 U.S.C. ? 654(a)(1), provides:Sec. 5(a) Each employer –(1) shall furnish to each of his employees employment and a place ofemployment which are free from recognized hazards that are causing orare likely to cause death or serious physical harm to his employees.[[2\/]] Former Commissioner Moran issued a sua sponte, general directionfor review. Commissioner Cleary issued a specific direction for reviewof all parts of the three citations. The Secretary’s petition forreview and brief address only items 1(a) and 2(a). Because neither partyhas taken exception to the judge’s disposition of citations 1(b), 2(b),3(a), and 3(b), and there is no compelling public interest in reviewingthose items, the Commission will not review them. Water WorksInstallation Corp., 76 OSAHRC 61\/B8, 4 BNA OSHC 1339, 1976-77 CCH OSHD ?20,078 (No. 4136, 1976); Abbott-Sommer, Inc., 76 OSAHRC 21\/A2, 3 BNAOSHC 2032, 1975-76 CCH OSHD ? 20,428 (No. 9507, 1976).Chevron also argues that the citations were not issued with \”reasonablepromptness\” as required under section 9(a) of the Act, 29 U.S.C. ?658(a). The inspection occurred in June of 1974 and the citations wereissued on October 18, 1974. Chevron argues that the Secretary hadsufficient information to issue one of the two citations now before usin August, 1974. The Commission has held that an employer mustestablish prejudice in the preparation of its defense in order to vacatea citation for lack of reasonable promptness. E.g., Stripe-A-Zone, 10BNA OSHC 1694, 1695, 1982 CCH OSHD ? 20,069, p. 32,781 (No. 79-2380,1982). The fact that the Secretary delayed the issuance of twocitations for two months until the third citation was ready is notenough to establish prejudice. Chevron has not shown how this two monthdelay hampered the preparation of its defense. We therefore reject itsargument.[[3\/]] Chevron had claimed under section 4(b)(1) of the Act, 29 U.S.C. ?653(b)(1), that the cited working conditions were exemptbecause the Department of Transportation had exercised statutoryauthority to adopt standards or regulations covering the conditions. Judge Martin did not reach this issue in his original decision. Afterthe Commission remanded for findings on the matter, 77 OSAHRC 29\/A2, 5BNA OSHC 1118, 1977-78 CCH OSHD ? 21,606 (1977), the judge rejectedChevron’s exemption claim on the basis of a stipulation reached by theparties. On review, Chevron states that as a result of thestipulation, its exemption claim as to citation 1(a) is no longer inissue. In view of this concession, we leave Judge Martin’s rejection ofChevron’s claim as to citation 1 undisturbed.We discuss Chevron’s exemption argument as to citation 2(a) in note 17,infra.[[4\/]] National Realty & Construction Co. v. OSHRC, 489 F.2d 1257, 1267(D.C. Cir. 1973).[[5\/]] Williams Enterprises, Inc., 79 OSAHRC 24\/A2, 7 BNA OSHC 1247,1250, 1979 CCH OSHD ? 23,478, aff’d, No. 79-1559 (D.C. Cir. June 9,1980); Continental Oil Co., 78 OSAHRC 63\/E1, 6 BNA OSHC 1814, 1816, 1978CCH OSHD ? 22,903, p. 27,703 (No. 1829, 1978), aff’d, 630 F.2d 446, 449(6th Cir. 1980), cert. denied, 450 U.S. 965 (1981); Southern Railway, 75OSAHRC 88\/C2, 3 BNA OSHC 1657, 1975-76 CCH OSHD ? 20,091 (No. 5960,1975). Our holding that hazards ought not to be defined in terms of theproposed means of abatement reflects this view. See Kansas City Power &Light Co., 82 OSAHRC 13\/A2, 10 BNA OSHC 1417, 1422, 1982 CCH OSHD ?25,957, p. 32,539 (No. 76-5255, 1982); Beaird-Poulan, 79 OSAHRC 21\/D11,7 BNA OSHC 1225, 1229, 1979 CCH OSHD ? 23,493, p. 28,459 (No. 12600,1979); Wheeling-Pittsburgh Steel Corp., 82 OSAHRC 102\/A2, 10 BNA OSHC1242, 1245, 1982 CCH OSHD ? 25,801, p. 32,244 (Nos. 76-4807 & 76-4808,1981)(hazard defined in terms of physical agent that would injureemployees), aff’d, No. 82-3015 (3d Cir. 1982).[[6\/]] We define the hazard in terms of the physical agents that couldinjure employees rather than the means of abatement. SeeWheeling-Pittsburgh Steel Corp., note 5 supra.[[7\/]] The dissent states that \”the ‘recognized hazard’ under [thegeneral duty clause] must be defined in terms sufficiently specific toencompass conditions or practices over which the employer can reasonablybe expected to exercise control.\” See also the dissenting opinion inKansas City Power & Light Co., 82 OSAHRC 13\/A2, 10 BNA OSHC 1417,1423-24, 1982 CCH OSHD ? 25,957 at pp. 32,540-41 (No. 76-5255, 1982). We disagree with the dissent’s definition of recognized hazard becauseit is duplicative of the requirement that the Secretary must show that aproposed means of abatement is feasible. In order for the Secretary toshow that the proposed means of abatement is feasible he must ofnecessity show that the employer can exercise control over the proposedabatement method. Implicit in the use of the word \”feasible\” is theidea that the employer can guard against only those hazards that arepreventable. See National Realty and Construction Co. v. OSHRC, 489F.2d 1257, 1265 (1973).The dissent also states that defining the hazard as pipeline corrosionis \”overly broad . . . . \” The dissent apparently believes that becausecorrosion is \”an inherent and unavoidable condition,\” it cannot beconsidered a hazard until it reaches a degree of corrosion which wouldthreaten to release gas or oil. We find this approach neither logicalnor consonant with the Act. There is no dispute that uncheckedcorrosion on pipelines will eventually cause the pipes to burst. Whenan entire industry, such as off-shore oil producers, is confronted witha condition that is always present and will, if unchecked, create anexplosion and fire, as occurred in this case, there is little doubt thata recognized hazard exists.[[8\/]] Tests conducted on the gas supply line pipe after the accidentindicated that the wall of this pipe section had eroded to about 34 milsfrom an original thickness of about 250 mils.[[9\/]] On the meaning of \”likely to cause,\” see R.L. Sanders RoofingCo., 79 OSAHRC 61\/D7, 7 BNA OSHC 1566, 1979 CCH OSHD ? 23,756 (No.76-2690), rev’d on another ground, 620 F.2d 97 (5th Cir. 1980). We donot reach the Secretary’s additional argument that, because corrosioncaused serious injury, the \”causing\” element of the statute was met[[10\/]] The dissent disagrees with our reading of the record withrespect to Chevron’s efforts to free the worksite of the hazard.However, we have examined the record as a whole and considered evidencein the context of its presentation.For example, when discussing Mr. Falgout’s testimony regarding thefrequency of \”inspections conducted by Chevron to determine corrosion,\”the dissent states that Mr. Falgout \”normally checked the condition ofstructure A twice each week.\” The implication is that there was sometype of planned periodic inspection for corrosion. However, whenreviewing the transcript, it is apparent that such was not the case. Tofairly represent the evidence, the dissent should have included Mr.Falgout’s testimony that, as field foreman, he was responsible for\”producing and operating block 69 field\” and safety considerationsconstituted only one reason for his visiting structure A. There is noevidence that Falgout ever conducted formal corrosion inspections. Mr.Falgout stated that he did not have a set schedule for visiting thestructures and that before the accident he had been visiting structure Aat least once a week and \”mostly twice a week.\” To label such a visitas an inspection for corrosion control misreads the record.The dissent also contradicts itself when discussing the detection andprevention of internal corrosion. The dissent states that the rate ofinternal corrosion is uniform regardless of pipe location. Then, in thevery next sentence the dissent notes that if a coupon detected metalloss, it would be moved upstream to locate exactly where the metal losswas occurring. If indeed the corrosion rate was uniform, then it wouldnever be necessary to pinpoint an area where internal corrosion was greater.[[11\/]] Chevron’s senior construction engineer testified that a \”riser\”is that section of pipe between the Gulf floor and the upper productiondeck of the platform.[[12\/]] A \”safe life\” is the amount of time a pipe wall remains strongenough to withstand normal operating pressure. Chevron noted that thepiping manual recommended that periodic inspections for corrosion \”shallbe equal to one-half of the calculated safe life . . .\” of the pipes onstructure A.[[13\/]] We have fully considered the fact that Chevron had arecordkeeping system. However, we believe that its system was notadequate to materially reduce the hazard of pipeline corrosion. It istrue that Chevron sent results of water samples to the field office andto the main office. However, there is no testimony that the results ofcoupon testing, visual inspections, and choke inspections were alsorecorded and sent to a central location where the information could beused to more accurately monitor corrosion.[[14\/]] Citation 1(b), which is not on review, exclusively concerned thelack of a recordkeeping system. In his brief on review, the Secretarydiscusses the lack of a recordkeeping system with respect to citation1(a). Chevron does not object to this and we agree with the Secretary’simplicit view that recordkeeping is integrally related to citation 1(a).[[15\/]] Chevron argues that a violation may not be found here becausethe Secretary failed to show that Chevron knew or with the exercise ofreasonable diligence could have known of the presence of the violation. See Prestressed Systems, Inc., 81 OSAHRC 43\/D5, 9 BNA OSHC 1864, 1869,1981 CCH OSHD ? 25,358, p. 31,500 (No. 16147, 1981)(? 5(a)(2)violation). Although Chevron’s argument is not sharply focused, itseems that Chevron maintains that it did not know and could not with theexercise of reasonable diligence have known of the corroded condition ofthe pipe that burst. Chevron’s argument is misplaced. The violationalleged here was not the bursting of a pipe or even corrosion of a pipe;the violation alleged was Chevron’s failure to inspect and test forcorrosion. Obviously, Chevron had actual knowledge of its owninspection and testing efforts.[[16\/]] Although we affirm these abatement requirements of citation1(a), it bears emphasis that Chevron is not precluded from institutingother, equally effective methods as long as its alternative methodsachieve at least as great a reduction of the hazard. See GeneralElectric Co., 82 OSAHRC 56\/A2, 10 BNA OSHC 2034, 2040 n.6, 1982 CCH OSHD? 26,259, p. 33,165 n.6 (No. 79-504, 1982). For example, Chevron wouldbe free to apply new technology to effectuate abatement.[[17\/]] Chevron originally claimed with respect to citation 2 that CoastGuard regulations on means of escape, life preservers, and ring lifebuoys on fixed offshore platforms (33 C.F.R. ?? 143.05-5(b) and 144.10-let seq.) covered the cited working conditions. These regulations wereadopted to implement the Outer Continental Shelf Lands Act, 43 U.S.C.A.?? 1301-1343 (1964), which authorizes the Department of Transportation,including the Coast Guard, to adopt regulations for offshore platformson the outer continental shelf. See 33 C.F.R. ?? 140.01-1 (\”Purpose ofregulations\”) and 140.05-1 (\”Application\”; \”Artificial islands and fixedstructures\”); 43 U.S.C.A. ?? 1333(a) and (e)(1)(1964). The \”outercontinental shelf\” begins three miles from the Louisiana coast. UnitedStates v. Louisiana, 363 U.S. 1, 81, 83 (1960); 43 U.S.C.A. ?? 1331(a),1301(a)(2) and (b), and 1312 (1964). Inasmuch as the record shows, andthe parties agree, that structure A was less than 3 miles off theLouisiana coast, Judge Martin held that the structure was not on theouter continental shelf and hence the working conditions were notcovered by the Coast Guard regulations. On review, Chevron does notdirectly attack the judge’s ruling but instead seems to urge that theCommission approve the judge’s view that the Coast Guard regulationswould be preemptive for platforms on the outer continental shelf. Wedecline Chevron’s invitation. It is enough to say that on the facts ofthis case, Judge Martin’s rejection of Chevron’s exemption claim wascorrect.[[18\/]] The dissent concludes that the Secretary failed to establishthat the use of automatic ejection systems was feasible. According tothe dissent, the Secretary must show that automatic ejection systemsexisted and would materially reduce the hazard and he must also showthat ejection systems \”would have been adaptable to Chevron’sstructure.\” However, we note that Chevron has not voiced thisobjection. At the hearing, Chevron made no attempt to rebut thecompliance officer’s testimony and did not claim that its platforms weresomehow different from Exxon’s and could not be equipped with theejection devices. In short, the compliance officer’s unrebuttedtestimony is sufficient to establish feasibility.[[19\/]] Section 17(k), 29 U.S.C. ? 17(j), states:For purposes of this section, a serious violation shall be deemed toexist in a place of employment if there is a substantial probabilitythat death or serious physical harm could result from a condition whichexists, or from one or more practices, means, methods, operations, orprocesses which have been adopted or are in use, in such place ofemployment unless the employer did not, and could not with the exerciseof reasonable diligence, know of the presence of the violation.[[20\/]] Section 17(j), 29 U.S.C. ? 661(i), provides:The Commission shall have authority to assess all civil penaltiesprovided in this section, giving due consideration to theappropriateness of the penalty with respect to the size of the businessof the employer being charged, the gravity of the violation, the goodfaith of the employer, and the history of previous violations.[[21\/]] 1 Standard & Poor’s Corp., Register of Corporations, Directorsand Executives 478 (1982).”
An official website of the United States government. 