“Docket No. 84-1285 SECRETARY OF LABOR,Complainant,v.PASCHEN CONTRACTORS, INC., Respondent.OSHRC Docket No. 84-1285DECISIONBefore: FOULKE, Chairman; MONTOYA and WISEMAN, Commissioners.BY THE COMMISSION:Paschen Contractors, Inc., contracted with the FloridaDepartment of Transportation to build the Sunshine Skyway Bridge across Tampa Bay from St.Petersburg to Bradenton. To accomplish this task, Paschen had an engineering firm design adevice to lift prestressed concrete slabs weighing over 200 tons. Paschen built thedevice, but the first time the lifting device was used it collapsed, injuring fouremployees. The Occupational Safety and Health Administration of the Department of Labor(\”OSHA\”) investigated the incident and cited Paschen for a willful violation ofthe standard at 29 C.F.R. ? 1926.550(d)(4).[[1\/]]Paschen was charged with willfully failing to load test the device, which the Secretaryalleged to be a modified gantry crane, in violation of the requirements set out in theAmerican National Standards Institute (\”ANSI\”) standard incorporated byreference into 29 C.F.R. ? 1926.550(d)(4). Paschen contested the citation, and a hearingwas held by an administrative law judge of this Commission.At the hearing, the primary issue tried by the parties waswhether the device was a \”gantry crane\” and therefore subject to therequirements of the cited standard. Although the judge did not agree with the Secretarythat the device was a gantry crane, he nevertheless concluded that Paschen’s machine wasgoverned by the cited standard because, under the scope provision of the ANSI standard,devices are covered if they have \”the same fundamental characteristics\” as agantry crane.[[2\/]] In the judge’s opinion, Paschen’s machine met this test for coverageunder the ANSI and OSHA standards. The judge also found that Paschen had committed awillful violation of the cited standard, and he therefore affirmed the citation. The casewas directed for review and is before the Review Commission pursuant to section 12 (j) ofthe Occupational Safety and Health Act of 1970, 29 U.S.C. ? 661(j).In order to establish a violation, the first element of theSecretary’s burden of proof is to show that the cited standard applies to the citedworking conditions. Dun-Par Engineered Form Co., 12 BNA OSHC 1962, 1986 CCH OSHD ?27,651 (No. 82-928, 1986). The citation alleged that the device was a gantry crane. Forthe reasons set forth below, we find that Paschen’s machine is not a gantry crane asdefined by the standard and we conclude that 29 C.F.R. ? 1926.550(d)(4) the standardcited, does not apply. We therefore reverse the judge’s decision and vacate the citation.The largest single component of Paschen’s lifting device was asteel framework, a \”gantry,\” approximately 15 feet high, 13 feet wide, and over300 feet long, which sat on the concrete piers that later would be the permanent supportsof the bridge. The piers were approximately 140 feet apart, so that the gantry wassupported approximately in the middle and near each end. After it had been lifted onto thepiers by a water-borne crane, the \”gantry\” could be moved into position on thenext pier, as sections of the bridge were completed.On the top of the \”gantry\” were rails along which atrolley could be moved. Mounted on the trolley were two lifting devices, one on each side.Although the trolley could be moved into position over a load before it made a lift, itwould not move while the load was suspended. Once a concrete segment was raised to theappropriate height, cables would be attached to the bottom edge and the segment would belifted into position rather than transported horizontally by moving the trolley.The OSHA standard under which Paschen was cited does not defineeither \”crane\” or \”gantry crane.\” It does, however, incorporate byreference ANSI B30.2.0-1967, which does define those terms. Section 2-0.2.1.1 defines theterm \”crane:\”A machine for lifting and lowering a load and moving ithorizontally, with the hoisting mechanism an integral part of the machine. Cranes whetherfixed or mobile are driven manually or by power.The term \”gantry crane\” is defined in section2-0.2.1.6: A crane similar to an overhead crane except that the bridge forcarrying the trolley or trolleys is rigidly supported on two or more legs running on fixedrails or other runway.That definition is complemented by section 2-0.2.1.8, whichsets out the definition of an \”overhead crane:\”A crane with a movable bridge carrying a movable or fixedhoisting mechanism and traveling on an overhead fixed runway structure.Based on our review of the record and the ANSI standard, weconclude that Paschen’s machine does not fit within the definitions in ANSI B30.2.0-1967.Because those definitions give us very little guidanceconcerning the characteristics of cranes generally and gantry cranes in particular, weview the information that is provided by the ANSI committee as being particularlyimportant. We are therefore unwilling to treat any part of the ANSI definitions lightly.In particular, we place significance on the language in the definitions that specifiesthat the legs of a gantry crane travel along rails and that a crane is a machine \”formoving a load horizontally\”.The first question before us is whether Paschen’s machine was a\”gantry crane,\” as the Secretary alleged. Under the ANSI definition, it is theability of the bridge to travel because its supporting legs are mounted on rails, not thepresence of a bridge or \”gantry,\” that makes a crane a gantry crane. Paschen’sdevice did not have legs mounted on rails. Instead, the bridge of the machine remainedstationary on the permanent concrete piers.Our conclusion that Paschen’s machine does not fall within thedefinition of \”gantry crane\” is reinforced by the illustrations in ANSI B30.2depicting the types of cranes covered by the standard and showing the directions they cantravel. As stated in the ANSI scope provision, supra at note 2, all of the cranesdepicted in these illustrations are \”grouped\” together because they all have\”similar travel characteristics.\” Specifically, the illustrations reveal thateach of the cranes depicted has the same three lines of travel: the load can be raised andlowered; it can be transported horizontally as the lifting mechanism travels back andforth across the bridge; and the bridge itself can move along rails in a directionperpendicular to the path of the trolley. By contrast, Paschen’s machine was able only tolift a load; its trolley was not designed to move in any direction while the machine wassupporting a load. Paschen’s machine therefore had only one of the three paths of travelcharacteristic of the cranes covered by the ANSI standard, although the trolley wascapable of moving across the bridge when the crane was not supporting a load. Based on thewording of the definition and the illustrations, we conclude that Paschen’s machine isclearly not a gantry crane, because it lacks the ability to travel on rails in a directionperpendicular to the gantry.Reading the ANSI definitions, we question whether the citedmachine was a crane at all. It appears from ANSI’s definition of the term\”crane\” that the primary function of a crane is to transport a load horizontallyand that the ability to lift may merely be a necessary incident to that function. Incontrast, Paschen’s machine was not intended to transport a load; it was designed merelyto lift its load to a height where it could be moved into place by other means. Ittherefore was not a machine \”for moving [its load] horizontally\” within the ANSIdefinition.For these reasons, we disagree with the administrative lawjudge’s conclusion that Paschen’s machine was governed by the crane standard because ithas the \”same fundamental characteristics\” as the cranes governed by thestandard. The judge misread the scope provision of ANSI B30.2, which says that thestandard applies to \”overhead and gantry cranes, including semi-gantry, cantilevergantry, wall cranes, storage bridge cranes, and others having the same fundamentalcharacteristics\”. We read that provision to say that the standard applies to thosecranes specifically mentioned and to other cranes having the same fundamentalcharacteristics. Our conclusion that the judge and the Secretary have erroneouslyinterpreted this provision is further supported by the sentence that follows it:\”These cranes are grouped because they all have trolleys and similar travelcharacteristics.\” That sentence makes clear that the emphasis of the scope provisionis on the travel characteristics of the machine, characteristics which Paschen’s devicedoes not share. The ability of a gantry structure to travel along rails must be one of themost fundamental characteristics of an overhead crane or a gantry crane, since it is theonly characteristic mentioned in the definitions. Contrary to the Secretary’s arguments,the language of the ANSI scope provision reinforces our view that the cited standard doesnot apply. Paschen’s machine is not a crane, and it does not have the same characteristicsas the cranes described in the standard. It therefore cannot be brought within the purviewof the standard by the scope provision.Because we find that Paschen’s machine was not designed\”for moving a load horizontally,\” we conclude that it is not a crane at all.Although it is not necessary that we determine what the machine is in order to decide thiscase, we note that Paschen’s expert witness opined that the machine was an \”overheadhoist,\” and Paschen has maintained that position throughout the course of thislitigation. OSHA has a standard governing overhead hoists, which is published at 29 C.F.R.? 1926.554. One of the provisions of that standard, subsection (a)(3), mandates that thehoist’s supporting structure must not impede free movement of the hoist and must notrestrict the hoist from lining itself up with the load. This indicates that an overheadhoist has at least limited ability to travel horizontally, as did Paschen’s device. TheANSI standard governing overhead hoists, ANSI B30.16-1973, indicates that the hoistmechanism may be mounted on a trolley that travels on overhead beams. See ?16-0.2.31. This information almost exactly describes Paschen’s device. We thereforeconclude that the cited machine most closely resembles an overhead hoist governed by ANSIB30.16. Consequently, the applicable OSHA standard appears to be 29 C.F.R. ?1926.554, andthe Secretary probably should have cited Paschen under that standard if any of itsprovisions were violated.[[3\/]]It is easy to see how the OSHA compliance personnel in thiscase mistakenly characterized Paschen’s device as a gantry crane. Even the engineers whodesigned the device called it a \”launching gantry,\” and a number of Paschen’sown employees referred to it as a \”crane.\” This confusion underscores thedifficulties an employer unfamiliar with the standards may experience in trying todetermine the requirements with which it must comply.It is precisely because of uncertainties like this that the Commission has in the pastencouraged pleading in the alternative when there is a question or controversy over whichstandard governs the cited conditions. E.g., McWilliams Forge Co., 11 BNAOSHC 2128, 2131, 1984 CCH OSHD ? 26,979, p. 34,671 (No. 80-5868, 1984). We take thisopportunity to repeat that recommendation.In conclusion, because the standard cited does not apply toPaschen’s machine, we reverse the decision of the administrative law judge and vacate thecitation.Edwin G. Foulke, Jr. ChairmanVelma Montoya CommissionerDonald G. Wiseman CommissionerDated: August 29, 1990SECRETARY OF LABOR,CompIainant,v.PASCHEN CONTRACTORS, INC.,Respondent.OSHRC Docket No. 84-1285APPEARANCES: Curtis L. Gaye, Esquire, Office of the Solicitor, U. S.Department of Labor, Atlanta, Georgia, on behalf of complainant.Davisson F. Dunlap, Esquire, George Barford, Esquire, and JamesR. Wiley, Esquire, Cariton, Fields, Ward, Emmanuel, Smith and Cutler, P.A., Tampa,Florida, on behalf of respondent.DECISION AND ORDERBRADY, Judge:\u00a0\u00a0\u00a0 This proceeding isbrought pursuant to section 10 of the Occupational Safety and Health Act of 1970 (Act) tocontest a citation issued by the Secretary of Labor (Secretary) pursuant to section 9(a)of the Act.The underlying facts in this case are not in dispute. PaschenContractors, Inc., (Paschen), contracted to build spans on the Sunshine Skyway Bridge, astructure of approximately four miles which connects St. Petersburg and Bradenton,Florida. A portion of the bridge was to be constructed with pre-cast roadway segmentsbeing placed alternately on either side of a pier until a span between two piers isclosed. The machine used by respondent to lift the roadway segments into place is thesubject of the dispute in this proceeding. Variously referred to in the record as a crane,a gantry, gantry crane and launching gantry, it was over 300 feet long and rested onsupports at three piers. On July 30, 1984, certain portions of the machine collapsed whileattempting to lift a roadway segment to the top of pier five north injuring fouremployees. An investigation by the Occupational Safety and Health Administration (OSHA)resulted in issuance of the citation.Respondent is charged with violating the regulation at 29C.F.R. ? 1926.550(d)(4) which provides as follows:(4) All overhead and gantry cranes in us shall meet theapplicable requirements for design, construction, installation, testing, maintenance,inspection, and operation as prescribed in the ANSI B30.2.0 – 1967, Safety Code forOverhead and Gantry Cranes.Section 2-1.3.5 of the American National Standards Institute(ANSI) B30.2.0-1967 states:Cranes may be modified and rerated provided such modificationsand the supporting structure are checked thoroughly for the new rated load by a qualifiedengineer or the equipment manufacturer. The crane shall be tested in accordance withParagraph 2-2.2.2. New rated load shall be displayed in accordance with Paragraph 2-1.1.1.Section 2-2.2.2 in turn provides that:Prior to initial use all new, extensively repaired, and alteredcranes should be tested by or under the direction of an appointed or authorized person anda written report furnished by such person, confirming the load rating of the crane. Theload rating should not be more than 80 percent of the maximum load sustained during thetest. Test loads shall not be more than 125 percent of the rated load unless otherwiserecommended by the manufacturer. The reports shall be placed on file where readilyavailable to appointed personnel.The alleged violation is described in the citation as follows:(a) On or about 7\/30\/84, the Gantry Crane, located atop piers 7n, 6n, and 5n of the newSunshine Skyway Bridge, had not been thoroughly checked as to the field modifications thatdiffered from the Certified detail drawings that had been provided by the designengineers. In addition, the crane had not been load tested prior to operational use inaccordance with the provisions of Paragraph 2-2.2.2.The Commission has held that in order to establish a violationunder section 5(a)(2) of the Act as alleged, it is necessary for the Secretary to show bya preponderance of the evidence that (1) the cited standard applies; (2) there was afailure to comply with the standard; (3) employees had access to the violative condition;and (4) the cited employer either knew or could have known of the condition with theexercise of reasonable diligence. Astra Pharmaceutical Products, Inc., 82 OSAHRC55\/E9, 9 BNA OSHC 2126, 1982 CCH OSHD ? 26,251 (No. 78-6247, 1985); DanielInternational Corp., 81 OSAHRC 71\/D6, 9 BNA OSHC 2027, 1977-78 CCH OSHD ? 21,679 (No.76-181, 1977).A primary issue in this case relates to the applicability ofthe standard. The Secretary maintains that the machine used by respondent was a cranesubject to the Overhead and Gantry Crane Standards. This contention is based primarily onthe scope of the ANSI standard at B30.2.0-1967. The general scope of the standard setforth at 2- 01 states it \”applies to overhead and gantry cranes, includingsemi-gantry, cantilever gantry, wall cranes, storage bridge cranes and others having thesame fundamental characteristics. These cranes are grouped because they all have trolleysand similar travel characteristics.\” It is alleged, therefore, that the machine inquestion is a crane subject to the standard in that it has the fundamental characteristicsof overhead and gantry cranes, including a bridge that moves, which in turn supports amovable hoisting mechanism capable of lifting a load and moving it horizontally. Inaddition, the machine, supported at piers 5n, 6n, and 7n, was capable of moving itselffrom pier to pier (Joint Ex. 6).Respondent points out that section 1926.550(d)(4) does notdefine a gantry crane but only references the ANSI standard in that regard. It, therefore,adopts a position based on the Commission’s reasoning in Lisbon Contractors, Inc.,_ OSAHRC __,11 BNA OSHC 1971, 1972-73, 1981 CCH OSHD ? 25,222 (No. 80-97, 1984). In thatcase, the Commission was faced with a situation where a backhoe was used to perform thefunction of a crane in lifting a trench box and lowering it into a trench. The Commissionoverruled several prior decisions which upheld the functional argument based on amachine’s use, and stated that the crane standards \”were tailored instead toparticular configurations and mechanisms of cranes and derricks rather than to themachine’s functions.\” Accordingly, it found the backhoe was not a crane, because itdid not have a \”boom\” within the meaning of the ANSI standard. Respondent,therefore, asserts that its machine did not have the configuration and mechanism of agantry crane as defined in section 2-0.2.1.6 which states:A crane similar to an overhead crane except that the bridge forcarrying the trolley or trolleys is rigidly supported on two or more legs running on fixedrails or other runway.In addition, reference is made to the scope clause of ANSIB30.2 which indicates the cranes \”… all have trolleys and similar travelcharacteristics.\” Thus, it is argued that although the hoist mechanism was mounted ona trolley and capable of horizontal travel on a truss, the truss was incapable ofperpendicular movement. In support of its position, respondent points out that theexamples depicted under \”Types of Cranes\” in joint exhibit 10 all have threedirections of movement:(1) vertical lift by a hoisting mechanism;(2) horizontal travel by a trolley along a bridge; and(3) transverse travel of the entire structure perpendicular to the bridge and the travelof the trolley along the bridge.Essentially respondent maintains that all B30.2 cranes arecapable of three directions of movement while supporting a load and there is nothing toindicate cranes covered by the standard can move in only one or two directions at a time.In determining the applicability of the standard, it must firstbe shown that respondent’s machine is a crane. A crane is defined in section 2-0.2.1.1 ofANSI B30.2 in pertinent part as follows:A machine for lifting and lowering a load and moving ithorizontally, with the hoisting mechanism an integral part of the machine . . . .The record discloses that respondent’s expert witnessquestioned whether the machine was a crane because he did not believe the hoistingmechanism was an \”integral part of the machine\” (Tr. 467). Complainant’sargument is adopted for the purpose of determining this issue. It is pointed out that\”in Webster’s New World Dictionary of the American Language, (2d ed. D.Guralnik 1972), ‘integral’ is defined as necessary for completeness; essential. Thelaunching gantry was erected for the purpose of lifting bridge segments and setting theminto position. The hoisting mechanism is absolutely necessary to perform this function anda launching gantry would be incomplete without it.\”The question which now must be decided is whether respondent’s machine, meeting thedefinition of a crane, is an overhead or gantry crane within the meaning of section1926.550(d)(4). It is concluded from the evidence of record, Commission precedent and thescope provisions of ANSI B30.2 that the standard does apply in this case.Since a definition for overhead and gantry cranes is not foundin the standard, clarification is sought in the scope provision of ANSI B30.2. Section2-0.1 identifies certain types of overhead and gantry cranes which are included and thenstates that B30.2 also applies to \”others having the same fundamentalcharacteristics.\” Without setting forth what specific features or attributes suchcranes must possess, the drafters obviously intended the standard’s application to thosecranes with varying but basic characteristics. The machine in question has been shown topossess the \”fundamental characteristics\” of the identified overhead and gantrycranes. These characteristics include a movable bridge carrying a movable hoistingmechanism and possessing the capability of moving itself from pier to pier. The fact thatit could not move perpendicular to the horizontal travel while mounted on a fixed runway,or perform three moving functions at the same time is not deemed dispositive in light ofthe machine’s basic components and its lifting capacity.Mr. Robert De Benedictis, the Secretary’s expert, testifiedthat \”it is very, very, very, very seldom and in fact practically never that youperform more than one function at a time\” when making heavy lifts with a gantry crane(Tr. 245). Respondent’s expert, Mr. Matthew Burkhart, agreed in stating \”it is notusually advisable to perform more than one function at a time.\” He also agreed thatthe operational characteristics of the machine as to load lifting and potential hazardsare the same as for a typical gantry crane (Tr. 488-490).The Commission, as seen in Lisbon Contractors, supra,and the cases discussed therein, has dealt with the question of applying the cranestandards to various machines performing lifting functions. Those cases were concernedwith machines performing lifting functions, whether they were designed for that functionor not. The machine in the instant case, however, was designed and used exclusively forthe purpose of lifting for a specific job and was even characterized by respondent onseveral occasions as a gantry crane (Joint Ex. 6; Tr. 84). For the purpose of thisdecision, it is also pertinent to note that the Commission in discussing the standard at29 C.F.R. ? 1926.550, captioned \”Cranes and Derricks\” stated:Given the purpose of the Act, any ambiguity in the standardshould be resolved in favor of eliminating the hazard to which the standard is addressed…………. Respondent’s argument would lead to the incongruousresult that machinery designed and manufactured specifically to perform a given functionshould be held to more stringent requirements than shop built equipment improvised toperform the same function …………we believe that this interpretation affords employeesthe greatest protection from the dangers of improvised equipment that may be inadequatefor the task to which it is put. Gil Haugan, 79 OSAHRC 107\/A2, 7 BNA OSHC 2004,1979 CCH OSHD ? 24,105 (Nos. 76-1512 & 76-1513, 1979).[[*\/]]Clearly, from the evidence respondent’s crane does not fit the precise definition of anoverhead or gantry crane. But in light of the scope provision of B30.2 and consistent withthe interpretation placed on 1926.550 by the Commission, the standard applies in thiscase.Complainant having shown that the cited standard applies, thequestion of whether respondent failed to comply must now be resolved. The record is clearthat no load tests were made as described in section 2-2.2.2 of ANSI standard B30.2 (Tr.123). Respondent, however, maintains that the section is only advisory and cannot ofitself provide the basis for a citation, and it was justified in relying on theconsultants who designed the machine to ensure its capability for lifting thepredetermined load. Also, it had met the requirements of section 2-1.3.3 in that allmodifications to the crane were checked thoroughly by the properly designated persons.There is no dispute that extensive modifications had been madeto the crane in question (Tr. 119, 156, 157, 208, 297). Since it was previously used inthe construction of a similar bridge to lift roadway segments weighing approximately 65 to70 tons, the modifications were necessary to enable it to lift the 220-ton segments at theSkyway Bridge.While section 2-1.3.5 recognizes that cranes may be modified,it also makes it mandatory that such cranes are to be tested and the new rated load mustbe displayed. Complainant accurately points out that reference to paragraph 2-2.2.2 onlydescribes the manner in which such load testing is to be conducted but in no way negatesthe mandatory requirements for testing under 2-1-3.5. The standard was, therefore,violated as alleged in the citation.The Secretary has classified respondent’s failure to load testthe modified crane as a willful violation. The Commission has interpreted the term\”willful\” in Asbestos Textile Co., ____ OSAHRC,_____, 12 BNA OSHC 1062,1984 CCH OSHD ? 26,101 (No. 79-3831, October 31, 1984), as follows:To establish that a violation was willful, the Secretary mustshow that it was committed with intentional, knowing or voluntary disregard for therequirements of the Act or with plain indifference to employee safety. e.See,e.g. D.A. & L. Caruso, Inc., 84 OSAHRC_____,11 BNA OSHC 2138, 2142, 1984 CCH OSHD ?26,985, p. 34,694 (No. 79-5676, 1984); Duquesne Light Co., 84 OSAHRC____,11 BNAOSHC 2033, 2040, 1984 CCH OSHD ? 26,959, p. 34,603 (No. 79-1692, 1984), pets. for rev.filed, Nos. 84-3520 & 84-3538 (3d Cir. Aug. 20 & 28, 1984). It is not enoughfor the Secretary simply to show carelessness or a lack of diligence in discovering oreliminating a violation; nor is a willful charge justified if an employer has made a goodfaith effort to comply with a standard or eliminate a hazard even though the employer’sefforts are not entirely effective or complete. Marmon Group, Inc., 84OSAHRC,____,11 BNA OSHC 2090, 1984 CCH OSHD ? 26,975 (No. 79-5363,1984), pet. for rev.filed, No. 84-2193 (8th Cir. Sept. 17, 1984), citing Mobile Oil Corp., 83OSAHRC____,11 BNA OSHC 1700, 1983 CCH OSHD ? 26,699 (No. 79-4802, 1983).Application of the Commission’s interpretation to the instantcase warrants the conclusion that respondent’s decision not to load test the crane was\”willful.\”The record is clear that respondent had actual knowledge of itsobligation under the Act, because it was bound by contract to comply with Federal Safetyand Health Standards (Ex. C-3. Tr. 352, 353, 441). The evidence also shows that respondentwas aware of its responsibility to perform load testing as required by the standard.On June 20, 1984, a meeting was held between Paschen, representatives of two engineeringconsultant firms, and the Florida Department of Transportation. As a result of thediscussion, several points were resolved, one of which was that (Joint Ex. 13):9. Prior to attempting lifting any precast SuperstructureSegments, Paschen Contractors have a comprehensive testing schedule to check out alllifting and jacking equipment.A representative of the engineering firm that designed thebridge and who attended the meeting, testified that, in his opinion, testing in thiscontext would involve load testing (Tr. 217, 221). It is clear from the record thatrespondent made a conscious decision not to conduct the testing referred to in the letter,designated joint exhibit 13. In a letter dated July 10, 1984, Mr. William Roach, ProjectManager, responded by stating, \”…We do not anticipate any comprehensive testingschedule before actual erection …\” (Joint Ex. 14). Although Mr. Roach did nottestify, his letter indicates that testing of the equipment would be performed prior tolifting. The facts show, however, that obviously no \”comprehensive testingschedule,\” or load testing was intended to check out the equipment.Mr. Andrew King, Assistant Project Engineer, testified that theneed to conduct a load test prior to July 30, 1984, had been discussed. He did not recall,however, details of the discussions and who was present (Tr. 171-172) Mr. King did notknow if the load rating of the gantry crane had been determined but did stencil \”150Tons\” on the load blocks of the movable crane. He stated the 150 tons had nothing todo with the lift in question, but \”I got those numbers from the maximum lift thatthose blocks would see due to another mode of erection\” (Tr. 162-165). Mr. HowardKronis, Gantry Foreman, testified that he discussed load testing with his superiors andmade some suggestions in that regard. He stated, \”At first, it met with favorableresponse but it never actually came off\” (Tr. 207, 209).In addition to respondent’s knowledge of its responsibility,the record discloses actual knowledge of the hazard created by noncompliance. There is nodispute that in the course of making the initial lift of a roadway segment on July 30,1984, employee concerns caused it to be put down (Tr. 175). It was determined that part ofthe support structure of the gantry began to give way (Tr. 200). Mr. King decided toinstall two additional tie-downs without further corrective action (Tr. 177). During thesecond attempted lift \”everything broke loose\” according to Mr. Kronis, andseveral employees were injured as a result of the crane’s collapse (Joint Ex. 2; Tr.203-207).The decision to proceed with the second lift with fullknowledge of the hazard created by the failure to load test is deemed a voluntarydisregard for the requirements of the Act and employee safety.The next question for determination concerns the amount ofpenalty to be assessed for the violation. Under section 17(j) of the Act, the Commissionis required to find and give \”due consideration\” to the size of the employer’sbusiness, the gravity of the violation, the good faith of the employer, and the history ofprevious violations in determining the assessment of an appropriate penalty. The gravityof the offense is the principal factor to be considered. Nacirema Operating Co., 72OSAHRC 1\/B10, 1 BNA OSHC 1001, 1971-73 CCH OSHD ? 15,032 (No. 4, 1972). The Commissionstated in Secretary v. National Realty and Construction Co., 72 OSAHRC 9\/A2, 1 BNAOSHC 1049, 1971-73 CCH OSHD ? 15,188 (No. 85, 1971), that the elements to be consideredin determining the gravity are: (1) the number of employees exposed to the risk of injury;(2) the duration of exposure; (3) the precautions taken against injury, if any; and (3)the degree of probability of occurrence of injury.Weighing all the foregoing factors in light of thecircumstances, it is concluded that a penalty in the amount of $2,500.00 is deemedappropriate.FINDINGS OF FACT1. Paschen Contractors, Inc., at all times hereinaftermentioned, was a contractor engaged in construction of the Sunshine Skyway Bridgeconnecting St. Petersburg and Bradenton, Florida.2. Commencing July 31, 1984, authorized representatives of theSecretary conducted an inspection of the aforesaid work site resulting in issuance of thecitation.3. A portion of the bridge was to be constructed with theplacement of pre-cast roadway segments alternately on either side of a pier until a spanbetween two piers was closed.4. On July 30, 1984, the crane collapsed while lifting a220-ton segment to the top of pier five north. Four employees were injured.5. The crane, with a movable bridge; movable hoist mechanism;and capable of moving itself; possessed the fundamental characteristics of overhead andgantry cranes.6. The Commission has applied the crane standards to various machines which performlifting functions whether they were designed for that purpose or not.7. The crane had been used in the construction of anotherbridge but lifted roadway segments weighing only 65 to 70 tons. It, therefore, hadundergone extensive modification prior to use in this case.8. Following modification, the crane and supporting structurewere not checked for the new rated load. It also had not been load tested prior tooperational use.9. Through meetings, discussions and correspondence,respondent’s officials were fully aware of the need to check the modified crane andsupporting structure. This included the need for load testing prior to operational use ofthe crane.10. After the crane’s first pickup of a roadway segment on July30, 1984, it was noticed that the support at pier five north had started to give way. Uponthe installation of two additional tie-downs, the second lift was attempted which resultedin the crane’s collapse and employee injuries.CONCLUSIONS OF LAW1. Paschen Contractors, Inc., at all times pertinent hereto,was an employer engaged in a business affecting commerce within the meaning of section3(5) of the Occupational Safety and Health Act of 1970, and the Commission hasjurisdiction of the parties and subject matter herein pursuant to section 10(c) of theAct.2. Respondent is, and at all times pertinent hereto, required to comply with the safetyand health regulations promulgated by the Secretary pursuant to section 6(a) of the Act.3. Respondent, at the time of the aforesaid inspection, was inviolation of 29 C.F.R. ? 1926.550(d)(4).ORDEROn the basis of the foregoing findings of fact, conclusions oflaw, and the entire record, it is hereby ORDERED:The citation is hereby affirmed and a penalty in the amount of$2,500 is hereby assessed.Dated this 15th day of October, 1985.PAUL L. BRADY JudgeFOOTNOTES: [[1\/]] That standard provides:?1926.550\u00a0 Cranes and derrricks.(d) Overhead and gantry cranes(4) All overhead and gantry cranes in use shall meet the applicable requirements fordesign, construction, installation, testing, maintenance, inspection, and operation asprescribed in the ANSI B30.2.0-1967, Safety Code for Overhead and Gantry Cranes.[[2\/]] That provision says:Section 2-0.1 Scope of B30.2Within the general scope, defined in Section I, B30.2 appliesto overhead and gantry cranes, including semi-gantry, cantilever gantry, wall cranes,storage bridge cranes, and others having the same fundamental characteristics. Thesecranes are grouped because they all have trolleys and similar travel characteristics.(emphasis added)[[3\/]] The parties did not litigate whether there wereviolations of any requirements in section 1926.554, and we will not adjudicate issues notbefore us. We mention, however, if the Secretary should encounter this situation again,that there may have been a violation of section 1926. 554(a)(2) here, as it was not thelifting mechanism that failed, but the support structure. Depending on the manufacturer’srequirements, there also may have been a violation of 1926.554(a)(6).[[*\/]] This decision was not overruled in Lisbon, supra,based upon the dissimilarity of the machines used as cranes.”