ALJ Decision in Ovation Plumbing, Inc., Becomes a Final Order of the Commission
CSHO Fred Peterson conducted an inspection of the Elevate Wolff-Havana project pursuant to Complainant’s construction inspection program. The construction program uses a randomly generated list of construction sites, which are assigned to individual area offices to be inspected within a one-month time frame. (Tr. 53). Elevate Wolff-Havana is a multi-unit residential construction project with eleven to twelve multi-story buildings. (Tr. 63–64). At the time of the inspection, the individual buildings were in various stages of completion, ranging from 10 to 85 percent complete. (Tr. 63). After he arrived, CSHO Peterson met with the superintendent, Clyde George, and the project manager, Lisa Marini, both of whom worked for the general contractor, MPC. (Tr. 65). George, Marini, and Chris Feagle, a representative from Safety First, accompanied CSHO Peterson during his inspection.